Drilling the oilway

Standard

Now everything has cooled down, Bob finished drilling the oilway in the timing shaft. The shaft itself was drilled through in the lathe when it was built, as was the flywheel on the Mill.

With the two now pressed together it’s simply a case of drilling through the pilot hole in the flywheel into the shaft, to pick up the hole along the axis. That completed and checked out with an airline, it’s finished!

Now we just have to complete the assembly and press in the crankpin.

About Sophie Whiptank - aka Bart

I'm just a bloke doing some stuff, the more interesting bits I post on my blog. Scroll down far enough and you'll see me riding from Melbourne Australia to Birmingham, England in 2014. But now I'm working on another project, a single cylinder motorbike engine at 2750cc!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s